How to prepare a flat before renovation

Updated 5 Aug 2026

Good preparation protects furniture, documents the starting condition and gives tradespeople clear access to the work area.

Before demolition begins, agree access, utilities, storage and the sequence of work with the contractor.

The checklist below helps prevent small logistical problems from becoming delays or extra costs.

Flat prepared for renovation with the work area cleared in Prague

Eight steps before work starts

1

Clear the rooms

  • Remove furniture, textiles, pictures and fragile items from the work area.
2

Protect what stays

  • Cover fixed elements, windows and shared routes with proper protective materials.
3

Photograph the starting condition

  • Record meters, walls, floors and existing damage before demolition.
4

Agree access

  • Confirm keys, working hours, lift use, parking and contact details.
5

Check utilities

  • Know where water, gas and electricity can be isolated before demolition.
6

Plan storage

  • Keep a dry place for materials and a safe route for waste removal.
7

Confirm the layout

  • Approve furniture, sockets, lights, doors and sanitary positions before first fix.
8

Tell neighbours

  • Share the agreed working schedule and keep common areas clean.

What should be ready before demolition?

  • A confirmed scope and sequence of work
  • Access and parking arrangements
  • Protection for common areas and remaining equipment
  • A place for materials and separated waste
  • Approved positions for services and furniture
  • Contact details for the person responsible on site

Frequently asked questions

Do I have to remove all furniture?

Anything in the work area should be removed or securely protected. For demolition, dust and moving materials, a completely clear room is usually the safest and fastest option.

Should I disconnect utilities myself?

Only where it is safe and appropriate. Gas, electrical and water disconnection should be handled by the responsible professional when the work requires it.

When should the layout be finalised?

Before channels, plumbing and electrical first fix. Socket, light, door and sanitary positions depend on the furniture and final layout.

Related service

Apartment renovations

Complete turnkey renovation of apartments and houses - from demolition to final clean-up. We take on projects in Prague and the surrounding area.

All articles

Planning a renovation?

Tell us what you have in mind. We'll get back to you within 24 hours and arrange a free, no-obligation viewing.